Barra do Dande · Angola

From molecule
to market.Industrial capability.

KAIROS Global Pharma is structuring an integrated platform to manufacture essential medicines, develop advanced nutraceuticals and build technical capability in Angola.

Official masterplanKAIROS Global Pharma CampusConceptual representation subject to engineering development.
Subtle masterplan motion
10 haTotal site area
12,600 m²Covered area — Phase 1
USD 44.4mEstimated pre-FEED investment
86Direct jobs — Phase 1
300K → 1MBottles/month — Nutra capacity
SADC+Priority target markets
01 / THESIS
What KAIROS is

A platform connecting manufacturing, quality, energy, data, talent and market access.

The concept brings together two engines — Pharma and NutraTech — with shared infrastructure, laboratories, utilities, logistics and technical training.

The final configuration will be closed through independent engineering, commercial validation, competitive procurement and stage-gate decisions.

Industrial system

Two engines.
One architecture.

Pharma addresses local and regional manufacturing. NutraTech seeks to create export capability, but remains the main area requiring commercial and physical validation.

01 · Pharma

Essential medicines.

Local manufacturing with GMP discipline.

01

Proposed initial portfolio

Paracetamol, Amoxicillin, Metronidazole, Ibuprofen and Saline — subject to final definition, registration and capacity.

02

Priority market

Angola, with regional expansion subject to demand, licences and qualification.

03

Implementation principle

Phase complexity and prevent the sterile component from compromising the first operation.

Differentiated products, mandatory commercial proof.

01

Five initial concepts

Formulations associated with performance, gut health, cognition, immunity and women’s health.

02

Development scale

Initial target of 300,000 bottles/month and scale-up to 1 million/month, still subject to line balance and CAPEX.

03

Investment condition

Net price, channel, distributors, formulas, certification and capacity must be evidenced.

Explore the platform
Numbers with context

The scale is clear.
So is the nature of each number.

The editorial system avoids presenting estimates and targets as completed facts. That distinction is a credibility tool.

01

Site area

10 ha
Documented basis
02

Proposed covered area

12.600 m²
Current concept
03

Current CAPEX

USD 44,415 M
Pre-FEED estimate
04

Phase 1 direct employment

86
Promoter forecast
05

Nutra scale capacity

1M frascos/mês
Target to validate
Project anatomy

The project can be read.
Zone by zone.

The public masterplan is conceptual. Final design depends on topography, geotechnical work, utilities, GMP flows, FEED and competent-authority approvals.

Planta técnica conceptual
Investment discipline

Capital should only follow evidence.

The thesis is not to build everything immediately. Capital is released as engineering, market, regulatory and financing evidence passes defined gates.

USD 44.415M

Current Phase 1 estimate. It is not a construction budget or financing commitment. It must be replaced by a Basis of Estimate supported by FEED and quotations.

Founder equity
71%
Target leasing
20%
Target incentives
9%
Development status

Knowing where we are is part of the project.

Transparency about maturity increases trust. The project is not yet ready for full construction.

G0 · Concept

Strategic definition

Concept, proposed location and initial dossier.

Completed / consolidating
G1 · Basis

Development basis

Leadership, commercial validation, studies and FEED.

Current stage
G2 · Design

Design and contracting

BoE, licences, contracts and financing.

Pending
G3 · Build

Construction

Controlled execution, quality and change control.

Not started
G4 · Operate

Qualification and launch

Validation, authorisations, manufacturing and market release.

Future
We are not selling a completed factory. We are building an industrial capability that must be proven.
KAIROS · project credibility principle
Institutional access

Detailed information for qualified parties.

The public website explains the project. The institutional portal should make models, reports, risk, engineering, documents and evidence available under controlled access.

Request access